Field practice

Clean routing, tested cabling, coordinated installs

Containment routing is planned before pulling begins, so cable pathways stay accessible and orderly. Each run is tested for continuity and performance before it is closed up.

We align our installation schedule with the building's MEP works, so low-voltage routes are placed around ducts, conduits, and finishes without rework.

How we work

From drawings to handover

01

Blueprint review

We study the drawings and MEP schedules to confirm routes, rack locations, and device points before work starts.

02

Cable pulling

Cables are pulled through planned containment with attention to bend radius and separation from power runs.

03

Termination

Each cable is terminated and tested so connections are verified before any equipment is energised.

04

Labeling and handover

Every cable and port is labeled and documented, and racks are dressed so maintenance teams can follow the system easily.